Excavation in limited areas around Jerrys Pond is being conducted by a certified, licensed abatement contractor under a MassDEP-approved work plan. The use of personal protective equipment (PPE), including Tyvek suits and respirators, is a proactive safety measure designed to protect workers from prolonged direct contact to potential contaminants. Air monitoring is being conducted both within workers’ breathing zones and at multiple perimeter monitoring stations around the work area. Monitoring results have confirmed that contaminants are not becoming airborne and that there is no risk to the either workers or surrounding community.  The use of Tyvek suits and respirators does not indicate the presence of an exposure hazard. Rather, these measures serve as a required precaution and an additional layer of worker protection in accordance with applicable regulations.  Following excavation, clean soil is being placed in the affected areas to support future site work and maintain long-term protective measures

October 2026

  • Week of October 5th, 2026:
    • Installation of boardwalk framing
    • Boardwalk railing fascia installation
    • Boardwalk decking installation
    • Planting and Seeding
    • Concrete sidewalk preparation

September 2026

  • Week of September 28th, 2026:
    • Installation of boardwalk framing
    • Boardwalk railing fascia installation
    • Planting and Seeding
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of September 21st, 2026:
    • Installation of boardwalk framing
    • Boardwalk railing fascia installation
    • Planting and Seeding
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of September 14th, 2026:
    • Installation of helical pile foundations along Rindge Avenue
    • Installation of boardwalk framing
    • Restoration plantings to continue
  • Week of September 7th, 2026:
    • Installation of helical pile foundations along Rindge Avenue
    • Installation of boardwalk framing
    • Restoration plantings to commence
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of August 31st, 2026:
    • Installation of helical pile foundations along Rindge Avenue
    • Installation of boardwalk framing
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.

August 2026

  • Week of August 24th, 2026:
    • Installation of helical pile foundations along Rindge Avenue
    • Potential for assembly of Floating Wetland
    • Potential for boardwalk framing to re-commence
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of August 17th, 2026:
    • Installation of helical pile foundations along Rindge Avenue
    • Potential for assembly of Floating Wetland
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of August 10th, 2026:
    • Installation of helical pile foundations along Rindge Avenue
    • Potential for assembly of Floating Wetland
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of August 3rd, 2026:
    • Boardwalk decking/railing to continue
    • Installation of helical pile foundations along Rindge Avenue
    • Placement of gravel base for Serpentine Pathway
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.

July 2026

  • Week of July 27th, 2026:
    • Boardwalk decking/railing to continue
    • Installation of helical pile foundations along Rindge Avenue
    • Placement of gravel base for Serpentine Pathway
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of July 20th, 2026:
    • Boardwalk decking/railing to continue
    • Coir fascine installation
    • Installation of helical pile foundations along Rindge Avenue
    • Placement of gravel base for Serpentine Pathway
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of July 13th, 2026:
    • Boardwalk Framing to continue
    • Placement of gravel base in southwest corner of site
    • Installation of helical pile foundations along Rindge Ave
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of July 6th, 2026:
    • Boardwalk Framing to continue
    • Placement of gravel base in southwest corner of site
    • Installation of helical pile foundations along Rindge Ave
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.

June 2026

  • Week of June 29th, 2026:
    • Boardwalk framing to continue
    • Excavation in Southwest Corner of site complete by end of week
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of June 22nd, 2026:
    • Installation of Pile Caps and Boardwalk Framing
    • Excavation in Southwest Corner of site
    • Excavation in Southwest Corner of site potentially complete
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of June 15th, 2026:
    • Installation of Pile Caps and Boardwalk Framing
    • Excavation in Southwest Corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of June 8th, 2026:
    • Installation of Battered Helical Piles and Pile Caps
    • Boardwalk Framing to commence
    • Excavation in Southwest Corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of June 1st. 2026:
    • Installation of Pile caps and Boardwalk Framing
    • Excavation in Southwest Corner of site potentially complete
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway

May 2026

  • Week of May 18th, 2026:
    • Installation of Battered Helical Piles and Pile Caps
    • Excavation in Southwest Corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of May 25th, 2026:
    • Installation of Pile Caps and Boardwalk Framing
    • Excavation in Southwest Corner of site
    • NO WORK ON MONDAY 5/25
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of May 4th, 2026:
    • Installation of Helical Piles
    • Excavation in Southwest Corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of May 11th, 2026:
    • Installation of Helical Piles
    • Excavation in Southwest Corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.

April 2026

  • Week of April 27th, 2026:
    • Installation of Helical Piles
    • Excavation in Southwest Corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave. Trucks entering/exiting from Southwest corner onto Alewife Brook Parkway.
  • Week of April 6th, 2026:
    • Removal/disposal of existing concrete sidewalk along Rindge Ave
    • Installation of pond turbidity curtain
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave.
  • Week of April 13th, 2026:
    • Installation of “serpentine pathway” in Northwest corner of site
    • Installation of Helical Piles
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave.
  • Week of April 20th, 2026:
    • Installation of “serpentine pathway” in Northwest corner of site
    • Installation of Helical Piles
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to remain closed, pedestrian detour to sidewalk South of Rindge Ave

March 2026

  • Week of March 30th, 2026:
    • Rindge Ave Sidewalk Closure
    • Removal of existing fence along Rindge Ave
    • Tree Removals scheduled for Friday April 3rd
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction; Sidewalk on North side of Rindge Ave to close, pedestrian detour to sidewalk South of Rindge Ave.
  • Week of March 2nd, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site; excavation in containment to occur for linear path/boardwalk connections
    • Gravel placement in excavation areas to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of March 9th, 2026:
    • Excavation in Northeast corner expected to be complete
    • Gravel placement in excavation areas to continue
    • Potential for helical pile installation to Commence
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of March 16th, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site
    • Gravel placement in excavation areas to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of March 23rd, 2026:
    • Site Work subcontractor to complete excavation activities at Northeast corner of site
    • Site Work Contractor to Demobilize
    • Gravel placement in excavation areas to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction

February 2026

  • Week of February 2nd, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site; excavation in containment to occur for linear path/boardwalk connections
    • Gravel placement for Linear Path “spur” at proposed communal garden to continue
    • Installation of Coir Fascine along pond edge @ Rindge Ave to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of February 9th, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site; excavation in containment to occur for linear path/boardwalk connections
    • Gravel placement for Linear Path “spur” at proposed communal garden to continue
    • Installation of Coir Fascine along pond edge @ Rindge Ave to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of Feb 23rd, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site
    • Gravel placement in excavation areas to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction

January 2026

  • Week of January 5th, 2026:
    • Clearing of approved vegetation in boardwalk footprint will continue
    • Site Work subcontractor to continue excavation activities at Northeast corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries, and subcontractor mobilization starting Wednesday 12/10/2025. Linear Path will remain open to public without obstruction
  • Week of January 12th, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site
    • Gravel placement for Linear Path “spur” at proposed communal garden to commence
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of January 19th, 2026:
    • Sitework Contractor to continue excavation activities at Northeast corner of site
    • Gravel placement for Linear Path “spur” at proposed communal garden to continue
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of January 26th, 2026:
    • Site Work subcontractor to continue excavation activities at Northeast corner of site
    • Gravel placement for Linear Path “spur” at proposed communal garden to continue
    • Installation of Coir Fascine along pond edge @ Rindge Ave to commence (Weather Dependent)
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction

Nov/Dec 2025

  • Week of December 8th, 2025:
    • Clearing of approved vegetation in boardwalk footprint will continue
    • Site Work subcontractor mobilization starting Wednesday
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries, and subcontractor mobilization starting Wednesday 12/10/2025. Linear Path will remain open to public without obstruction
  • Week of December 15th, 2025:
    • Clearing of approved vegetation in boardwalk footprint will continue
    • Sitework Contractor to commence excavation activities at Northeast corner of site
    • Traffic Update: Linear Pathway from MBTA Bus turnaround @ Rindge Ave to Russel Field will be utilized for misc. material deliveries. Linear Path will remain open to public without obstruction
  • Week of December 22nd, 2025:
    • Sitework Contractor to continue excavation activities at Northeast corner of site
    • Site closed December 25th 2025